What We Do

Our Capabilities.

From rapid drainage repairs using precast panel technology to specialist sub-contracting for major LTA, HDB and residential developments, every project benefits from our integrated multi-disciplinary capability.

01 · Earthworks

Site preparation, excavation, grading and bulk earthworks for residential, commercial and infrastructure developments.

Bulk earthworks under way across the site, with excavators working the ground and steel-plate access laid in the foreground.
Bulk earthworks under way across the site, with excavators working the ground and steel-plate access laid in the foreground.
  • Major excavation earth cutting.
    Major excavation earth cutting.
  • Excavation for pile caps & sub structures.
    Excavation for pile caps & sub structures.
  • Earthworks — site preparation, excavation and grading.
    Earthworks — site preparation, excavation and grading.
  • Site clearance and excavation for shafts.
    Site clearance and excavation for shafts.
  • New cul de sac road formation.
    New cul de sac road formation.
  • Backfill compaction in a sheet-piled trench.
    Backfill compaction in a sheet-piled trench.
  • Typical BTO External Works
    Typical BTO External Works
  • Earthworks, turfing and site reinstatement works beneath a viaduct.
    Earthworks, turfing and site reinstatement works beneath a viaduct.

02 · Drainage Works

Roadside drains, U-drains, box drains, culverts and back-lane drainage systems — backed by active term contracts with PUB, Singapore’s national water agency.

Deep reinforced-concrete drain with rebar mat in place.
Deep reinforced-concrete drain with rebar mat in place.
  • Precast drain culvert installation, with precise placement within a constrained site.
    Precast drain culvert installation, with precise placement within a constrained site.
  • Completed concrete drain in operation, with green safety railings and pipes crossing the channel.
    Completed concrete drain in operation, with green safety railings and pipes crossing the channel.
  • Completed concrete trapezoidal drain channel with green safety railings.
    Completed concrete trapezoidal drain channel with green safety railings.
  • Deep trench excavation with strutting, plant and crews at work.
    Deep trench excavation with strutting, plant and crews at work.

03 · Concrete Repair & Structural Rehabilitation

Specialists in concrete repair and structural rehabilitation, certified under BCA CR05 Level 3.

Concrete repair and structural rehabilitation in progress.
Concrete repair and structural rehabilitation in progress.

04 · Earth Retaining Structures

Sheet piling (including Z-shape), retaining walls, slope stabilisation and excavation support systems.

Earth retaining structures — deep excavation with steel strutting.
Earth retaining structures — deep excavation with steel strutting.
  • Excavator at work in a deep excavation pit, viewed from above, with scaffold access and crews in PPE.
    Excavator at work in a deep excavation pit, viewed from above, with scaffold access and crews in PPE.
  • Two excavators at work in a deep excavation.
    Two excavators at work in a deep excavation.
  • Final ground leveling works in deep tunnel shafts.
    Final ground leveling works in deep tunnel shafts.

05 · Road Construction & Traffic Management

New roads, road widening, junction modifications, signalised traffic islands, kerbing and milling & patching — delivered alongside live-traffic management.

Aerial view of completed junction improvement works, including traffic island installation to optimise traffic flow and enhance road safety.
Aerial view of completed junction improvement works, including traffic island installation to optimise traffic flow and enhance road safety.
  • Road construction — asphalt laying alongside live traffic.
    Road construction — asphalt laying alongside live traffic.
  • Completed footpath, cycling path and bus shelter works as part of integrated commuter infrastructure.
    Completed footpath, cycling path and bus shelter works as part of integrated commuter infrastructure.
  • Road diversion works comprising temporary lane closures, traffic barrier installation, and new junction road markings.
    Road diversion works comprising temporary lane closures, traffic barrier installation, and new junction road markings.
  • Resurfacing and road marking works completed within a constrained night schedule, with the roadway reopened to traffic.
    Resurfacing and road marking works completed within a constrained night schedule, with the roadway reopened to traffic.
  • Resurfaced road with new “AHEAD” road marking.
    Resurfaced road with new “AHEAD” road marking.

Featured site work also includes road diversion works with temporary lane closures and new junction road markings, footpath, cycling path and bus shelter works, precast drain culvert installation in constrained conditions, junction improvement works with traffic islands, and comprehensive resurfacing and road marking completed within a constrained night schedule.

06 · Trial Trench & Cable Laying

Service detection, utility mapping, open-pit excavation and cable-laying works.

  • Trial trench and cable-laying works in an open pit.
    Trial trench and cable-laying works in an open pit.
  • Underground pipe laying in a trench.
    Underground pipe laying in a trench.

07 · Demolition

Demolition of structures with controlled execution, safe dismantling and site reinstatement.

Demolition of a concrete structure by grapple excavator.
Demolition of a concrete structure by grapple excavator.
  • Site cleared after demolition, with rubble ready for removal.
    Site cleared after demolition, with rubble ready for removal.
  • Road breaking with a hydraulic breaker attachment.
    Road breaking with a hydraulic breaker attachment.
  • Waste minimisation and concrete recycling.
    Waste minimisation and concrete recycling.

08 · General Building

Delivery of general building works and reinstatement with controlled execution and site integration.

NKF Integrated Renal Centre @ 500 Corporation Road — RC works for A&A and ancillary structures (sub-station, bin centre, drop-off porch, linkway).
NKF Integrated Renal Centre @ 500 Corporation Road — RC works for A&A and ancillary structures (sub-station, bin centre, drop-off porch, linkway).
  • Sembawang Country Club — RC works (sub-contract).
    Sembawang Country Club — RC works (sub-contract).
  • Toh Guan Ramp-up Warehouse — sub-structure works (sub-contract).
    Toh Guan Ramp-up Warehouse — sub-structure works (sub-contract).
  • Concourse Skyline @ Beach Road — reinforced concrete work at Podium & Residential Blocks (sub-contract).
    Concourse Skyline @ Beach Road — reinforced concrete work at Podium & Residential Blocks (sub-contract).
Chat on WhatsApp