Main contract awards from government agencies, complemented by extensive experience in specialist sub-contracting and joint ventures with leading A1-grade contractors in Singapore.
39
Completed
13
Ongoing
52
Total Projects
Featured Projects
PUB Drainage Reference Projects
In-depth case studies of our flagship Public Utilities Board engagements — nationwide drainage repair, large-scale roadside drain upgrades and 24/7 emergency response.
PUB · Improvement to Roadside Drains V
Contract W3 — Enterprise Road, Pioneer, Sunset Way & Pasir Panjang
Extensive drainage and infrastructure upgrades across 10 locations including Enterprise Road, Pioneer, Sunset Way, Pasir Panjang and Dover Avenue — U-drains, box drains, culverts and back-lane systems delivered around live 22 kV – 400 kV cable networks, the Gas Transmission Pipeline, NParks-protected heritage trees and staged LTA traffic diversions.
PUB · Term Contract for Minor Drainage Construction Works
3rd Term — Nationwide Drainage Standby (running to October 2026)
Nationwide 24/7 standby for urgent PUB drainage repairs — addressing spalling concrete, collapsed walls and structural failures across any location in Singapore. Highlight: a 350-metre two-tiered trapezoidal drain at Seletar North Link delivered in three months using precast panel technology versus the typical multi-month in-situ casting timeline.
Penrose, Leedon Green, Lentor Modern, Normanton Park & More
Specialist sub-contractor on multiple new condominium developments delivering box drains, covered linkways, road widening and junction enhancements — including LTA land-parcel-sale roadworks executed under multi-stage traffic diversions, signalised traffic islands and live-traffic safety protocols.
LTA · MRT Station & North-South Corridor
NSC Tunnel Drainage Diversion (Sin Ming Ave – Ang Mo Kio Ave 3)
Drainage diversion for LTA Contract N109A — widening a live drain into a 4.5-metre box culvert between Sin Ming Avenue and Ang Mo Kio Avenue 3 using Z-shaped sheet piles, system formworks and 24/7 site operations to meet tunnelling milestones at the most downstream Kallang River outfall.
PUB · Residential Estate Upgrading Programme
Roadside Drain Upgrading — River Valley, Clementi, Limau, Moonstone & More
Main specialist sub-contractor across multiple PUB Residential Estate Upgrading contracts (River Valley, Clementi, Limau, Moonstone, St. Michael's and more) — over 20 km of drainage delivered to date with proactive stakeholder engagement and phased execution to maintain resident accessibility throughout.
Work in the Field
Featured Work
On-site photographs from completed Buildwick projects across drainage, road, junction and reinstatement scopes.
Carried out road diversion works comprising temporary lane closures, traffic barrier installation, and new junction road markings in compliance with traffic management and safety standards
Completed footpath, cycling path and bus shelter works as part of integrated commuter infrastructure.
Executed precast drain culvert installation for drainage works, ensuring precise placement and integration within constrained site conditions.
Aerial view of completed junction improvement works, including traffic island installation to optimise traffic flow and enhance road safety.
Executed earthworks, turfing and site reinstatement works under nearby viaduct conditions, ensuring proper restoration and integration with surrounding infrastructure.
Executed comprehensive resurfacing and road marking works within a constrained night schedule, successfully completing and reopening the roadway.
NKF Integrated Renal Centre @ 500 Corporation RoadRC works for A&A and ancillary structures (sub-station, bin centre, drop-off porch, linkway). Provision of RC labour for A&A works, including structural alteration, installation of new reinforced concrete elements, and construction of ancillary structures comprising sub-station, bin centre, drop-off porch, and linkway.
Sembawang Country ClubSupply of labour for RC works (Sub-contract). Provision of RC labour for A&A works to an existing 2-storey clubhouse, including structural alterations, reinforcement installation, and new terrace erection.
Toh Guan Ramp-up WarehouseSupply of labour for sub-structure works (Sub-contract). Provision of labour for substructure works, including earthworks, foundation construction, pile caps, and footings for a 6-storey ramp-up warehouse with ancillary office.
Concourse Skyline @ Beach RoadSupply labour for reinforced concrete work at Podium & Residential Blocks (Sub-contract). Provision of RC labour for superstructure works of a mixed-use development, comprising a 41-storey residential tower and multi-storey podium structure.
Active Pipeline
On-going Projects
Ongoing projects across civil, infrastructure, earthworks, and building works, supported by long-term partners and joint venture collaborations.
Active
Infrastructure Works at Jurong East Central & Jurong West Street 93
Construction of trunk sewer at Jurong East Central; earthwork, road widening and junction improvement works at Jurong West Street 93.
Active
Road Widening at Tanjong Rhu Road, Kampong Arang Road & Sampan Place
Earthwork, road widening, drainage, bus shelter installation, high & low linkway and junction improvement works.
Active
Road Improvement Work at Bukit Merah View
Earthwork, road widening, drainage and junction improvement works.
Active
PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 03)
24/7 response team for PUB — flash-flood dewatering, construction of new drains, road and concrete repair for spalling works.
CE works above the contiguous bored pile wall (Phase 1): construction of new box drain and other CE drainage.
Active
Seletar Green Walk & Luxus Hill Heights Landed Housing (156 units, Phase 10)
Earthwork, construction of new box drain, new road and other enhancement works for 156-unit envelope-control landed development in Serangoon planning area.
Active
LTA N109A — North-South Corridor Tunnel (Sin Ming Avenue to Ang Mo Kio Avenue 3)
Demolition, earthwork disposal and widening of existing drain to 4.5m wide culvert drain; sheet piling, design and diversion of live drain.
Active
Hoe Chiang Road / Lim Teck Kim Road Hotel & Service Apartments — External Works
External works for a part 3-storey, part 30-storey hotel (808 rooms) and service apartment (37 rooms) development with 2 basement carparks: road widening, drainage, bus shelter and junction improvements.
Active
Emerald Katong — Neighbourhood Park CE Works
External and civil engineering works for the neighbourhood park.
Active
Tampines Street 62 Executive Condominium (14 blocks · 760 units)
Earthwork, external and civil engineering works for a 14-block 14-storey executive condominium with basement carpark and communal facilities.
Earth excavation and disposal works for a 4-block 18-storey residential development with multi-storey carpark.
BCA CW02 · Civil Engineering
Completed Civil Engineering Projects
27 delivered drainage, road and infrastructure projects across PUB, LTA, HDB, JTC, URA and private residential developments.
URA Zion Road — Design & Construction of Temporary Carpark
Design-and-build of new surface carpark including earthwork, driveway, drainage and M&E related works.
PUB Improvement to Roadside Drains V — Contract W3
Road raising and widening, junction diversions, improvement of existing roadside drains to new box drain with footpath, RC box culvert, kerb and water main pipe diversion across Enterprise Road, Pioneer Sectors 1 & 2, Sunset Way, Jalan Pelepah, Pasir Panjang Road, South Buona Vista, Dover Avenue and Bukit Timah Road.
PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 02)
Immediate response team for PUB — flash-flood dewatering, construction of new drain, road and concrete repair for spalling structural drain works.
PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 01)
Immediate response team for PUB — flash-flood dewatering, construction of new drain, road and concrete repair for spalling structural drain works.
Penrose — Residential Flat Development at Sims Drive (Geylang)
Earthwork, construction of new box drain, linkway, road widening / new road and enhancement to existing road junction & slip road for a 5-block 18-storey residential development with childcare centre, MSCP and communal facilities.
HDB Geylang Contract 13 (Building Works · 1,382 dwelling units)
Earthworks, drainage, external new road and EPS works (Part A + Part B contingency works).
Entrance culvert and covered drain plus earthwork, new box drain, linkway and road widening / new road / enhancement works integrated with an 8.1m drainage reserve.
Construction of new box drain and road widening / new road and enhancement works for a 9-block 24-storey residential, 22-unit strata terrace, restaurant and 7 shops with 2 basement carparks.
LTA J111 — Jurong Region Line: Enterprise Station, Tukang Station & Viaduct
Supply of labour and tools for construction of RC drains and road works.
LTA DE 145 — Bus Stop Infrastructure Enhancement & Construction
Demolition of existing bus shelters and construction of new bus shelters and road.
HDB Punggol East Contract C49 — Building External Works
Earthwork disposal, construction of new CE drain and service road.
LTA DE 137 — Proposed Commuter Infrastructure Enhancement
Earthwork disposal and supply of labour & tools for construction of RC enhancement works.
Upgrading of residential estate existing C7 drain to new box drain with footpath, box culvert, kerb and other civils works.
PUB Roadside Drains EUP Batch 7 Contract 5 — Moonstone Lane / St Michael's Estates
Upgrading of residential estate existing C7 drain to new box drain with footpath, box culvert and kerb works.
BCA CW01 · General Building
Completed General Building Projects
12 reinforced concrete and structural works engagements for commercial, residential, industrial and institutional developments — delivering labour, formwork, rebar and precast installation expertise.
Alexandra Terrace Commercial Building — Block 2, Block 3 & Podium
Supply of labour for RC works — concrete, reinforcement rebar and formwork.
79 Robinson Road — 29-storey Office Development (Downtown Core)
Supply of labour for RC works — concrete, reinforcement rebar and formwork for a 29-storey office with 5-storey podium, 2 basements and underground pedestrian network (UPN).
Fishery Port Road — Warehouse Ramp
Supply of labour for RC works — concrete, reinforcement rebar and formwork.
Scotts Road Residential Flats Development
Supply of labour for RC works — formwork.
Jalan Pemimpin Commercial Building
Supply of labour for RC works — concrete, reinforcement rebar and formwork.
JTC Factory at Tanjong Kling — Block 3, 5, 7, 9
Supply of labour for RC works — concrete, reinforcement rebar and formwork.
HDB Remaking of Heartland (ROH) — Hougang N1 & N2
Construction of new playground, shelter, drains, footpaths and landscaping.
Sky Everton Park — 36-storey Residential (262 units)
Supply of labour for RC walls and external roadside drains.
NKF Integrated Renal Centre @ 500 Corporation Road (Jurong Police Station A&A)
Supply of labour for RC works — A&A to existing 3-storey building, new sub-station, bin centre, drop-off porch, linkway and other ancillary structures.
GEMS International School — Block B & C Precast Installation
Supply of labour for installation of precast panels.
Bukit Timah Primary School — A&A and New 4-storey ISH
Supply of labour for RC works — new sport hall and external roadside drains.
Choa Chu Kang Cemetery Office
RC drainage, IC sump and RC fencing wall with footings.